New Bedford/Fall River Rail Project
South Coast Rail

Rail Project Maps

Maps October 2009

DRAFT September 2009 - The Attleboro Alternative

DRAFT September 2009


DRAFT September 2009 - The Attleboro Alternative

DRAFT September 2009


DRAFT September 2009 - The Attleboro Alternative

DRAFT September 2009


DRAFT September 2009 - The Attleboro Alternative

****Northeast Corridor, New Third Set of Tracks, Canton Viaduct
DRAFT September 2009


DRAFT September 2009 - The Attleboro Alternative

****Northeast Corridor, Existing Canton Viaduct - Photos
DRAFT September 2009


DRAFT September 2009 - The Attleboro Alternative

****Northeast Corridor, New Third Set of Tracks, Mansfield Station
DRAFT September 2009


DRAFT September 2009 - The Attleboro Alternative

****2.8 Mile New Double Track (100' Wide) Attleboro By-Pass
DRAFT September 2009


DRAFT September 2009

DRAFT September 2009
6. Attleboro Alternatives

Orange = Single Track
Green = Double Track
Blue = Triple Track
O = Train Station Stops (Yellow Bars – Existing) (Black Bars – New)

In between Orange Single Track (Through Barrowsville/Norton) And Blue Triple Track (South of Mansfield Station): Green Double Track = New 2.8 Mile 100 ft. Wide ‘Attleboro By-Pass’
Blue Triple Track (From South of Mansfield Station into Readville) = To Be Constructed: New Third Set of Tracks along the Northeast Corridor


DRAFT September 2009

DRAFT September 2009
Attleboro Alternative, Attleboro By-Pass

Broken Black Line = Attleboro/Norton Boundary
Pink Cross-Pattern Section = National Grid Power Line Right-of-Way
Orange Line = Proposed Alignment of the New 2.8 Mile 100 ft. Wide Double Track
   Attleboro By-Pass from
   The Attleboro Secondary (CSX Freight Line, Norton) to
   Just south of Richardson Ave.
   With At-Grade Crossings on: Pleasant St. (Rte. 123) and Richardson Ave.
Tiny Red Triangles = Residential Noise Impacts (Horn Blasting)
   Attleboro: Pike Ave., Pleasant St., Frontier Dr., Plain St.
   Attleboro & Norton: Richardson Ave.
Tiny Pale Yellow Dots = Residential Noise Impacts (Train on Track)


DRAFT September 2009

DRAFT September 2009
Attleboro Alternative, Attleboro By-Pass

Broken Black Line = Attleboro/Norton Boundary
Pink Cross-Pattern Section = National Grid Power Line Right-of-Way
Orange Line = Proposed Alignment of the New 2.8 Mile 100 ft. Wide Double Track Attleboro By-Pass from
   South of Pleasant St. (Rte. 123) Attleboro to
   Connection with the Amtrak’s Northeast Corridor Line in Mansfield
   Including: Wetlands & Vernal Pools
Thin Green Outlines = Protected Open Space:
   Nickerson Walking Woods, Medeiros Family Preserve, Gilbert St. Rear
Tiny Red Triangles = Residential Noise Impacts (Horn Blasting)
   Attleboro: Pike Ave., Pleasant St., Frontier Dr., Plain St.
   Attleboro & Norton: Richardson Ave.
Tiny Pale Yellow Dots = Residential Noise Impacts (Train on Track)


DRAFT September 2009

DRAFT September 2009
Attleboro Alternative, Amtrak’s Northeast Corridor

Broken Black Line = City and Town Boundaries
Orange Line = Alignment of New Third Set of Tracks to be constructed
   from the Readville Section of Boston south to Westwood
   On the Westerly/Outbound Side of the Existing Track


DRAFT September 2009

DRAFT September 2009
Attleboro Alternative, Amtrak’s Northeast Corridor

Broken Black Line = Canton/Sharon Boundary
Orange Line = Alignment of New Third Set of Tracks to be constructed
   through Canton into Sharon
   On the Westerly Side of the Existing Track through Canton and Part of Sharon
   Crossing Over to the Easterly/Inbound Side of the Existing Track in Sharon
Requires: Relocation of Canton Jct. & Sharon Train Stations


DRAFT September 2009

DRAFT September 2009
Attleboro Alternative, Amtrak’s Northeast Corridor

Broken Black Line = Sharon/Foxboro Boundary
Orange Line = Alignment of New Third Set of Tracks to be constructed
   From Sharon Station into Foxboro
On the Easterly/ Inbound Side of the Existing Tracks
Requires: Relocation of Sharon Train Station


DRAFT September 2009

DRAFT September 2009
Attleboro Alternative, Amtrak’s Northeast Corridor

Broken Black Line = Foxboro/Mansfield Boundary
Orange Line = Alignment of New Third Set of Tracks to be constructed
   Through Foxboro into Mansfield
On the Easterly/Inbound Side of the Existing Tracks
Requires: Relocation of Mansfield Station and Route 106


DRAFT September 2009

DRAFT September 2009
Attleboro Alternative, Northeast Corridor & Attleboro By-Pass in Mansfield

Broken Black Line = Mansfield/Norton Boundary
Orange Line = Alignment of New Third Set of Tracks to be constructed
   along Amtrak’s N.E. Corridor through Mansfield, to the
   the New Double Track Attleboro By-Pass south of Gilbert St.
On the Easterly/Inbound Side of the Existing Tracks


DRAFT September 2009

DRAFT September 2009
Attleboro Alternative, Attleboro By-Pass

Broken Black Line = Town Boundaries
Orange Line = Alignment of New 2.8 Mile 100 ft. Wide Double Track Attleboro By-Pass
   to be constructed from Mansfield into Attleboro & Norton
   Connecting with the Attleboro Secondary (CSX Freight Track) at Chartley
   Pond in Norton


DRAFT September 2009

DRAFT September 2009
Attleboro Alternative, Attleboro Secondary (CSX Freight Track)

Broken Black Line = Norton/Taunton Boundary
Orange Line = Alignment of the Attleboro Alternative along the Attleboro
   Secondary (Existing CSX Freight Track – To Be Reconstructed)
   Through Norton & Taunton


DRAFT September 2009

DRAFT September 2009
Attleboro Alternative, Attleboro Secondary (CSX Freight Track)

Orange Line = Alignment of the Attleboro Alternative along the Attleboro
   Secondary (Existing CSX Freight Track – Top Be Reconstructed)
   Through Taunton


DRAFT September 2009

DRAFT September 2009
Attleboro Alternative, NOISE IMPACTS: Attleboro & Norton

Along: The New 2 ½ mile Double Track Attleboro By-Pass
38 New MBTA Trains (70+MPH) Each Weekday

Along: Attleboro Secondary (CSX Freight Track, To Be Reconstructed)
38 New MBTA Trains (70+MPH) Each Weekday
Compared with 2 Slow Moving Freight Trains Operating in 2009 at Midnight & 6:00 A.M.


NOISE IMPACTS: Taunton
Sorry we missed this diagram.
Previous Studies (NB/FR Commuter Rail Project Sep. 1995 ENF Vol. III) Indicated
With 15 At-Grade Crossings within a 1 ¼ Mile Segment of the Inner City:
There would be 348 Moderate Impacts and 160 Severe Noise Impacts


DRAFT September 2009

DRAFT September 2009
Town of Mansfield

Partial View of the Scope of Work
To Accommodate Construction of New Third Set of Tracks, along Amtrak’s Northeast Corridor

Including:
Moving of the Mansfield Train Station and Commuter Parking Lots
Reconstruction of North Main Street Bridge

Large Xs = Some of the Existing Structures to be Removed or Relocated
Small x = Mansfield Ave. and Crocker St. Relocated


Earlier Maps


The 3 Proposed Routes Click for a larger map.
LEGEND:
Yellow lines = New Bedford & Fall River existing freight tracks (CSX), merging at Myricks Junction in Berkley, then running together on single freight track to Cotley Junction in Taunton.
From Cotley Junction there are three different rail routes to reach Boston:
Light Blue Line, west side = 'Attleboro Alternative'
Pink Line, center = 'Stoughton Alternative'
Purple Line, east side = 'Middleboro Alternative'



The Attleboro Alternative Click for a larger map.
The Attleboro Alternative in Norton & Attleboro:
Existing CSX freight track through Norton - ‘The Attleboro Secondary’ and
Proposed Attleboro By-Pass through Norton & Attleboro, then into Mansfield



The Attleboro Alternative Detail Map 1 Click for a larger map.
Source:
MBTA Enviromental Notification Form (ENF)
New Bedford/Fall River Commuter Rail Project
September 1995 Volume 1

Existing CSX freight track through Norton - ‘The Attleboro Secondary’ (Identified as Conrail) and
Proposed Attleboro By-Pass - over Chartley Pond in Norton, along Nat’l. Grid ROW through Attleboro, then into Mansfield connecting with existing Shore Line (New York, Providence, to Boston)



The Attleboro Alternative Detail Map 2 Click for a larger map.
Source:
MBTA Enviromental Notification Form (ENF)
New Bedford/Fall River Commuter Rail Project
September 1995 Volume 1

Existing CSX freight track through Taunton - ‘The Attleboro Secondary’ (Identified as Conrail) with 15 at-grade crossings in Taunton, crossing through Three Mile River Watershed into Norton, with grade crossing on Woodward St.